A modular house is delivered in large, pre-assembled units.
A timber frame element house is different. The house is produced as wall, roof and floor elements, then assembled on site. This gives more flexibility in architecture, makes transport across Europe easier and allows the house to adapt better to different plots, local rules and design preferences.
A well-built timber frame house can be very energy-efficient. The performance comes from insulated wall elements, airtight construction and modern ventilation with heat recovery. With the right design and technical solution, the house can meet current European energy requirements and keep heating costs low throughout the year.
Choose Semi-Finished if you want the house structure and exterior completed, but plan to manage the remaining works locally.
Choose Full Turnkey if you want a broader delivery scope, with the house completed according to the agreed specification and less coordination required from your side.
Semi-Finished includes the timber frame structure, exterior envelope, windows, roof and weatherproof installation. Interior works are completed separately, usually with local contractors.
Full Turnkey includes the structural part, interior finishes, heating, ventilation and agreed sanitary solutions. The exact scope is always confirmed in the contract, so both sides know what is included.
The final price depends on the size of the house, architectural complexity, energy class, façade materials, technical systems, delivery location and the selected finishing level.
In Full Turnkey projects, interior choices such as flooring, tiles, doors, sanitary ware, lighting and other finishes have a direct impact on the budget. A clear specification from the beginning helps keep the final price predictable.
Existing models can be adjusted, or the house can be developed based on the client’s own architectural design.
Layout, facade materials, window placement and technical solutions are reviewed according to the plot, local building requirements and project brief.
Foundation and site preparation are usually organised locally. We provide the required structural drawings and load information, so the foundation can be designed to match the timber frame system.
Once the required approvals are in place and the foundation is ready, the time from production to installation is usually around 3–16 weeks, depending on the house type, package and project complexity.
On-site assembly of the prefabricated elements is usually completed within a short timeframe, as most of the structural work is prepared in advance.
Yes. We deliver and install prefabricated timber frame houses across Europe. Transport, logistics and on-site assembly are planned as part of the project, based on the destination and access to the plot.
We provide a structural warranty according to European construction standards and the agreed contract terms. The warranty covers the load-bearing structure and the structural integrity of the house.
A properly designed and maintained timber frame house can last for generations. Timber construction has a long history in Northern Europe and remains a reliable choice for residential buildings, especially when the structure is protected from moisture and built according to modern standards.
The base price usually includes the agreed house package, structural elements, selected materials and the installation scope described in the offer.
Items such as foundation, site preparation, utility connections, permits, local taxes, landscaping and some interior works may be excluded, depending on the package. These details are always clarified before the contract is signed.
Timber frame houses are well suited for cold climates when designed with proper insulation, airtightness and ventilation. The wall, roof and technical solutions are selected according to the local climate and energy requirements.
The house can be adapted to local building regulations, depending on the destination country and project conditions. Technical details, energy performance and documentation are reviewed during the planning stage.